Summer Consultants designed the systems for two new restroom facilities and two combination concession and restroom facilities at a multi-sport recreational complex. The combination unit also included umpire rooms, IT closets, storage spaces, and covered seating areas. One unit also includes a second story observation room with views of multiple playing fields. HVAC systems included… Read More
Arlington Public Schools Trade Center
Summer Consultants provided mechanical and electrical design services for the reconfiguration and renovation of an educational facility. The project provides a new entry vestibule, conference and training rooms, offices, break room and rest rooms. The existing Direct Expansion (DX) rooftop units were modified with the addition of hydronic heating coils. Two new rooftop units and… Read More
DLA McNamara Headquarters Complex HVAC Renovations
As a follow-on design to an HVAC and energy study of the McNamara Headquarters Complex, Summer Consultants designed upgrades to the HVAC systems serving the 1.12 million SF office building. Three 500-ton chillers were replaced with 700-ton chillers and and existing 300-ton chiller was modified to improve performance. New variable frequency drives were installed on… Read More
Brault Building, Northern Virginia Community College
Summer Consultants provided mechanical, electrical, and plumbing engineering design services as part of a multi-discipline team for the $13 million renovation and expansion of the Brault Building on the Northern Virginia Community College campus in Annandale. The project renovated the three-level, 29,200 SF administrative building and added 20,200 SF. The project earned a LEED® Silver… Read More
Northern Virginia Community College CS Schuler Science Laboratory Building
Summer Consultants provided mechanical, electrical and plumbing engineering design for the renovation and expansion of a 50,000 SF two-level science classroom facility into a 60,000 SF state-of-the-art wet laboratory building with 25 fume hoods. Features of the project included the relocation of several laboratories, expansion of the Physical Science and other laboratories, and a new… Read More