Summer Consultants provided mechanical and electrical engineering design services as part of a design-build renovation project. The reconfiguration provides a new collaboration area, presentation area and storage space. Renovations included new walls, ceilings, doors, and flooring as well as new paint. Mechanical improvements included a new dedicated outside air system (DOAS) to provide ventilation air… Read More
Dover Air Force Base Building 262 Innovation Laboratory
Summer Consultants provided mechanical and electrical engineering design services as part of a design-build renovation of the first floor of an office building. The reconfiguration provides a new collaboration area, presentation area and storage space. Renovations included new walls, ceilings, doors, and flooring as well as new paint. Mechanical improvements included a new dedicated outside air… Read More
Dover Air Force Base B550
Summer Consultants designed the replacement of the dry-pipe sprinkler system serving the storage and loading dock areas of the Household Goods and Transportation Office at Dover Air Force Base. A new compressed air system with six zones replaced the autonomous in-rack sprinkler system. A new dual air/nitrogen generator provides a combined 21,000 CFH of compressed… Read More